Town Hall Conditions Assessment Predicts Repairs Will Cost Over $4.5 Million Over Time
At the September 13 Board of Selectmen meeting, Town Manager Justin Sultzbach presented the physical and financial details of the just-released September 2, 2021 report from Building Conservation Associates INC, based on its findings and those of Abacus Architects of Boston. Sultzbach informed the Board that the total Town Hall repairs needed, over time, will cost at least $4,535,464 when adjusted for inflation.
The projected repair cost of over $4.5 million arrives on the heels of the Senior Center's needing $5 million in total repairs as a historically protected building which must be preserved and maintained. At the same time, the town is confronting the challenge of how to fund a new and up-to-date Fire Station which meets the current legal codes and requirements the existing building falls far short on. A previous study estimated that the Fire Station could potentially cost as much as $13 million for entirely new construction if additions to the existing building are not sufficient to meet the department's needs. The necessary Town Hall repairs caused by the weather and elements span decades of neglect without a viable financial plan ever being formulated to pay for long term exterior upkeep and maintenance.
The portion of the Town Hall constructed in 1850, housing both the Town offices and private businesses, suffered heavy fire damage in the years 1880 and 1925, as detailed in the report. Currently attached to the north side of the building by a connecting addition built in 1980, the rear of the Town Hall was constructed in 1876 and used by the Fire Department for 102 years, until 1978. From 1980 until 2016 this structure housed the Police Department.