MassDOT Closes Bridge over Millers River as Winter "Tropical Storm" Drenches Region

An unusual strong winter rainstorm dropped heavy rain on north Central Massachusetts from Sunday night, December 17 though Monday, December 18, along with gusting winds that brought down trees and caused some local power outages. According to meteorologists, the storm behaved more like a tropical storm than the kind of snowy Nor'easter we expect in the winter in New England. Stretching over the entire Eastern seaboard, the weather system drew moisture from the Gulf of Mexico and dumped rain at an intense rate more typically seen in brief cloudbursts and squall lines.
The local area didn't experience as much rainfall nor as severe wind as parts of the state close to the coast and to the south. According to the National Weather Service, west Ashburnham recorded 2.15 inches of rainfall in 24 hours, while Rindge recorded 1.97 inches (Winchendon has no official observer to make reports). But the amount of rain that fell within short periods of time flooded basements and raised rivers and streams to rampaging heights. The water level in Lake Momononac, which was at its lowest with its annual winter "draw down," went up several feet to engulf exposed banks and beaches. Locally, the wind gusts reached 37mph on Monday. The Monday Winchendon police log listed at least seven calls about trees or wires down and five calls reporting flooded streets and roads. A stream of water was reported running across the UU church property to Central Street. One resident reported raw sewage flowing from overwhelmed older drains unable to handle the volume of rainfall.
The Massachusetts Department of Transportation (MassDOT) came out to check bridges on state-owned highways over the Millers River and were alarmed. On Tuesday morning, MassDOT closed the bridge over the Millers River on River Street between Tannery Hill and Waterville Plaza. Director of Public Works Brian Croteau told the Courier on Wednesday afternoon, "We were only given limited information on this that they were shutting down the bridge. The bridge was shut down by Mass DOT District 2 bridge team as the water levels had risen to the height of the warning level on the side of the bridge. I am not sure of the duration of time it will be out. This is dependent on the water dropping low enough below the marking."
