NOTICE OF ADJUDICATION AND PUBLIC COMMENT HEARING EFSB 23-02/D.P.U. 23-45 - New England Power Company d/b/a National Grid A1/B2 Refurbishment: Warwick to Sterling Transmission Replacement Project Este es un aviso importante sobre un proyecto de energía propuesto en las ciudades de Warwick, Royalston, Athol, Winchendon, Gardner, Westminster, Fitchburg, Leominster y Sterling. Si desea esta información en español, por favor vaya a www.newenglanda1b2.com.
Project Summary and Public Comment Hearing Overview
New England Power Company, doing business as National Grid ("National Grid" or the "Company") proposes to replace an existing double circuit transmission line, tap lines, and structures with a new double circuit overhead transmission line, tap lines, and structures in an existing transmission corridor in Warwick, Royalston, Athol, Winchendon, Gardner, Westminster, Fitchburg, Leominster, and Sterling, Massachusetts (the "Project"). The Project would be capable of operating at 115 kilovolts ("kV"), although it would initially operate at 69 kV, as does the existing line. A description of the Project is provided below.
The Siting Board will conduct three public comment hearings with both in person and remote participation options: Wednesday April 10, 2024, at 1:00 PM Athol Public Library Program Room 568 Main Street Athol, MA 01331 Wednesday April 10, 2024, at 6:30 PM Mount Wachusett Community College North Cafeteria 444 Green Street Gardner, MA 01440 Thursday April 11, 2024, at 6:30 PM Fitchburg State University Ellis White Lecture Hall 160 Pearl Street Fitchburg MA 01420 Remote attendees: join by clicking (or entering) this link https://us06web.zoom.us/j/87501780143 from a computer, tablet, or smart device. For audio- only participation, attendees can dial in at (646) 558-8656 (not a toll-free number) and then enter the Webinar ID: 87501780143.
To provide oral comments during the public comment hearings (in person or on Zoom), please send an email to Yonathan.Mengesha@mass.gov with your name, email address, mailing address, and specify which hearing location, by noon April 9. To provide comments by telephone, please leave a voicemail message referencing "EFSB 23-02" at (617) 305-3544 with your name, telephone number, mailing address, and specify which hearing date, by noon April 9. Pre-registered commenters will speak first, and other commenters afterwards.
The Siting Board also invites written comments on the Project. Written comments will be most useful to the Siting Board if submitted by Friday April 26.
Important Dates: Public Comment Hearings: April 10 & 11, 2024 Deadline to File Written Comments: April 26, 2024 Deadline to file for intervention/limited participant status: April 26, 2024
Public Comment Hearings
You are invited to a public comment hearing to learn more about the Project and provide comments on the proposed Project. To build the Project, National Grid needs approval from the Energy Facilities Siting Board ("Siting Board"), part of Massachusetts state government.
The Company will present an overview of the Project. Public officials and members of the public will have an opportunity to ask questions and make comments about the proposed Project. The public comment hearing will be transcribed by a court reporter. A recording of the public comment hearing will be available on the Siting Board's YouTube channel after the hearing.
Public Review of the Company's Petition
A detailed description of the Project is electronically available via the Siting Board's webpage for the Project: https://www.mass.gov/info-details/national-grid-replacement-project. In addition, links to the Company's petitions, attachments, and analysis are on the webpage, and have been provided to the municipalities of Warwick, Royalston, Athol, Winchendon, Gardner, Westminster, Fitchburg, Leominster, and Sterling. The Company also maintains a webpage for the Project: https://www.newenglanda1b2.com/ .
Hard copies of the Company's petitions, including all attachments, are available for public inspection at the following locations:
Boston Energy Facilities Siting Board, One South Station, 3rd floor, Boston, MA 02110
Municipalities Directly Impacted Municipal/Clerk offices and main public libraries in Warwick, Royalston, Athol, Winchendon, Gardner, Westminster, Fitchburg, Leominster, and Sterling
Warwick: Clerk Office 12 Athol Rd Warwick, MA 01378 Library 4 Hotel Rd Warwick, MA 01378
Athol: Clerk Office 584 Main St Ste 10 Athol, MA 01331 Library 568 Main St Athol, MA 01331
Gardner: Clerk Office 95 Pleasant St Rm 121 Gardner, MA 01440 Library 55 W Lynde St Gardner, MA 01440
Royalston: Clerk Office 5 School St Royalston, MA 01368 Library 19 On The Cmn. Royalston, MA 01368
Winchendon: Clerk Office 109 Front St Ste 3 Winchendon, MA 01475 Library 50 Pleasant St Winchendon, MA 01475
Westminster: Clerk Office 11 South Street Westminster, MA 01473 Library 118 Main St Westminster, MA 01473
Fitchburg: Clerk Office 166 Boulder Dr, Ste 108 Fitchburg, MA 01420 Library 610 Main St Fitchburg, MA 01420
Leominster: Clerk Office 25 W Street Room 5 Leominster, MA 01453 Library 30 West St Leominster, MA 01453
Sterling: Clerk Office 1 Park St Sterling, MA 01564 Library 4 Meeting House Hill Rd Sterling, MA 01564
Decision on the Project Proposal
Intervention and Participation
https://www.mass.gov/doc/980-cmr-105/download
Filing Instructions
David.Waterfall@nationalgrid.com
Accommodation Requests
Non-discrimination Notice
Contact
Project Description
https://fileservice.eea.comacloud.net/FileService.Api/file/FileRoom/17423325
https://www.newenglanda1b2.com/
Route Description by Municipality
Additional Unrelated Substation Work