WESTMINSTER — The Planning Board approved the Low Impact Development application for 125 Ellis Road, granting waivers for a proposed 11,694-square-foot storage barn 15:03.
- Meeting minutes from September 22nd — Approved 1:38
- 125 Ellis Road LID application with waivers — Approved 14:52
- Modification of Home Depot occupancy condition — Approved 57:06
- Close public hearing on BESS bylaw — Approved 72:02
- Approve BESS bylaw draft — Approved 72:26
- Add data center definition from Mansfield bylaw — Approved 82:31
- Adjourn meeting — Approved 83:18
The meeting in a minuteVideo brief · 0:40Watch
More briefs →The project, presented by Brian Marchetti of McCarty Engineering on behalf of the owner, adds approximately 4,000 square feet of new impervious area 4:21. Tetra Tech confirmed via a letter received on October 13 that all stormwater concerns have been addressed 4:02.
Home Depot occupancy condition modified
The board modified the occupancy condition for the Home Depot at Lot I-7 to require that 'plans' be deemed adequate by the Planning Board, DPW, Police, and Fire, rather than the measures themselves being in place 57:06.
The Home Depot is currently operating under a temporary occupancy permit and requires a long-term permit to continue operations 21:25. The second tenant, Craft Unified Global Packaging, at Lot I-8 is scheduled to open in mid-2027 21:03.
A roundabout at the intersection of Route 2A and Depot Road is planned to be built by the state in 2030 24:37. MassDOT denied a traffic signal because it did not meet the eight-hour signal warrant 19:17.
The board agreed that DPW, fire and police would be notified of its concerns about traffic before the improvements are in place.
Battery Energy Storage Systems bylaw approved
The Planning Board approved the draft bylaw for Battery Energy Storage Systems (BESS) for Westminster 72:42.
The bylaw includes a new section on pages 27 through 29 detailing requests from the Fire Chief 62:58. It also includes a decommissioning fund to ensure site cleanup if the company goes bankrupt 67:40.
The bylaw was based on a framework provided by the state 71:08.
Data center definition added
The Planning Board added a definition for data centers from the Mansfield bylaw, stating a facility is a data center if more than 25% of gross floor area is devoted to server racks or if the primary purpose is housing computer servers 82:46.
The board will present the data center bylaw to the advisory board on the 27th of the current month and will not hold a regular meeting on that date 73:08.
- Approved the meeting minutes from September 22nd 1:38.
- Noted that the intersection of Route 2A and Depot Road is state-owned 48:43.
- Noted that the current traffic control is a two-way stop control 20:23.
- Waivers were requested for sections 6.1, 6.2, 6.3, 6.4, 6.5, and 6.6 of the bylaws, specifically including 6.2.2, 6.2.3, 6.4, and 6.6.
- The Planning Board discussed the potential cost of police traffic control, One member asked, hypothetically, whether the business park would share the cost if the town said police coverage would cost $90,000 a year, adding that it would not cost that much.
- The town planner said he added a new table of uses for brownfield sites (page 10). Delete the duplicate lines.
- The Planning Board noted that the BESS bylaw includes a new table of uses under the provisions for brownfield sites on page 10.
- The Planning Board noted that the BESS bylaw includes a new table of uses under the provisions for brownfield sites on page 10.